Skip to main content

Commercial and industrial users

Turn your energy bill into a structured, financeable project

You know your consumption and your constraints. SCARAB turns them into a pre-feasibility pitch that developers and financiers can act on.

Pain points & outcomes

What changes once your project is on SCARAB

Energy costs are rising and unpredictable

A quantified savings scenario with LCOE and payback before spending on studies.

Outages and diesel dependency hurt production

Hybrid and storage options sized on your real load profile and outage history.

No internal energy engineering team

A guided questionnaire that turns operational data into a technical project file.

Hard to find credible developers and financing

Direct exposure to vetted developers and financiers active in your country.

Workflow preview

What we ask you

Around 20 minutes of operational data — no engineering study required.

  • Site location and grid connection
  • Annual consumption (kWh) and peak demand (kW)
  • Hourly or shift-based load profile
  • Current tariff and diesel spend
  • Available land / rooftop surface
  • Reliability and sustainability objectives

Example output

What you receive

Illustrative pre-feasibility summary for a cement grinding plant in Douala.

Illustrative example of a pre-feasibility output — not a client project. Your figures come from your own site data.

Recommended capacity
18.5 MWp + 6 MWh storage
CAPEX range
$19.8M – $23.1M
Estimated LCOE
0.071 $/kWh
Annual savings
$2.9M (-26%)
Simple payback
6.4 years
Viability score
84 / 100

Create your project in under 20 minutes